# Consumables Runbook — Receiving, Issuing, Reordering, Write-Offs Companion to the Field Ops Runbook — that one covers tools (checkout, signature, return). This one covers the other half of the store: how new stock first enters the system, consumable parts that get used up rather than returned, and a field technician requesting parts for themselves — plus the two things that make routine restocking low-maintenance: automatic reordering and loss visibility. Login URL (this test environment): **http://localhost:8083/login** ## Demo accounts | Role | Email | Password | |---|---|---| | Dispatcher | dispatcher@sightbox.local | Dispatch2026! | | Technician (Stock User) | site.supervisor@sightbox.local | FieldTech2026! | | Store Manager | store.manager@sightbox.local | StoreMgr2026! | ## The scenario A delivery arrives at Main Store with both parts and a tool. Later, ongoing maintenance work keeps drawing down PVC Pipe Fitting stock — including a technician who runs short on-site and requests more for themselves. Separately, a box of Wall Anchor Kit gets damaged on a job and needs writing off. --- ## Stage 1 — Receive new stock into Main Store Every item — consumable or tool — enters the system here, before anything else can happen. 1. Search **New Stock Entry**. Set **Purpose: Material Receipt**, **Target Warehouse: Main Store - JPT**. 2. Add Row: **PVC Pipe Fitting 1/2in**, Qty **50**, **Basic Rate: 0.75**. 3. Add Row: **Cordless Drill - DeWalt 20V**, Qty **1**, **Basic Rate: 179.00** — assign it a new **Serial No** (e.g. **TOOL-00004**). This is what makes this specific unit traceable for the rest of its life in the system. 4. Capture the **Signature** of whoever received the delivery, and attach a **Photo** of the packing slip or the items themselves. 5. Click **Submit**. **What happens:** stock rises immediately at Main Store — both items are now on hand, and the new drill's own Serial No record exists, ready to be checked out (see the Field Ops Runbook). ⚠ If Basic Rate is skipped, ERPNext blocks submission with a valuation error — since this entry isn't linked to a Purchase Order, a rate has to be entered by hand. Know this before a live demo so it doesn't look like something broke. --- ## Stage 2 — Store Manager logs parts used at a property The routine case: the store manager issues parts directly, no request needed. 1. Search **New Stock Entry**. Set **Purpose: Material Issue**. 2. Set **Source Warehouse: Main Store - JPT**. 3. Add Row: **PVC Pipe Fitting 1/2in**, Qty **15**. 4. In Remarks, note the job — e.g. "Riverside Plaza — hallway lighting repair." 5. Capture the **Signature** of whoever collected the parts. 6. Click **Submit**. **What happens:** Main Store's PVC Pipe Fitting drops by 15, the cost is attributed to this specific job on the Stock Ledger, and there's a signed record of who took it — not just a number that quietly went down. --- ## Stage 3 — Technician requests parts for themselves Not every request comes through the office. A technician on-site who's run short doesn't need the dispatcher to ask on their behalf — they can raise it directly. Log in as the **Technician**. 1. Click the search bar. Type **New Material Request** and press Enter. 2. Set **Material Request Type** to **Material Issue**. 3. Add Row: **PVC Pipe Fitting 1/2in**, Qty **5**. 4. In Remarks, note which job it's for. 5. Click **Save**, then **Submit**. **What happens:** the request status automatically becomes **Pending Approval** — the same workflow as any other request, regardless of who raises it. --- ## Stage 4 — Store Manager approves the request Log in as the **Store Manager**. 1. Search **Material Request**, press Enter, open the technician's request from Stage 3. 2. Click the **Approve** button at the top of the form. **What happens:** the request moves to **Approved** and is now ready for anyone with fulfillment access to act on — not necessarily the store manager themselves. --- ## Stage 5 — Dispatcher fulfills it Log in as the **Dispatcher**. 1. Search **Material Request**, open the approved request from Stage 4. 2. Click **Create** → **Stock Entry**. The item line carries over automatically. 3. Confirm **Purpose: Material Issue**, **Source Warehouse: Main Store - JPT**. 4. Capture the **Signature** of whoever is collecting the parts. 5. Click **Submit**. **What happens:** the Dispatcher — not the Store Manager — physically executes the approved request. Fulfillment isn't gatekept behind one role; anyone with the same stock access the Dispatcher already has can close out an approved request, useful when the store manager is busy elsewhere or the dispatcher is the one actually coordinating who's picking up what. --- ## Stage 6 — The system raises a reorder on its own No login needed for this one — it's automatic. PVC Pipe Fitting is configured to reorder itself once Main Store's stock drops under 20 units. 1. Once real usage crosses that line, search **Material Request** and open the list. 2. Look for one raised with no human touching it — the system generated it the moment stock hit the threshold. **What this shows:** nobody has to remember to check stock levels. The shortage surfaces itself before the store actually runs out, not after. *To trigger this live during a demo:* issue enough PVC Pipe Fitting to cross below 20 (repeat Stage 2's steps with a larger quantity). This consumes real demo stock — a quick Material Receipt (Stage 1's pattern, above) tops it back up afterward. --- ## Stage 7 — Report a damaged consumable 1. Search **New Stock Entry**. Set **Purpose: Material Issue**, **Source: Main Store - JPT**. 2. Add Row: **Wall Anchor Kit**, Qty **1**. 3. Set **Issue Reason: Damaged**. 4. In Remarks, note briefly what happened. 5. Capture the **Signature** of whoever is reporting it. 6. Click **Submit**. **What happens:** the stock is removed, the loss is attributed to a specific, selected reason, and it's signed for — not just a mystery drop in the count someone has to investigate later. --- ## Stage 8 — Pull the Damage & Cost Report 1. Search **Damage & Cost Report**. 2. Filter by Warehouse, Item, or Issue Reason as needed. **What this shows:** real-time loss and damage totals by property or site, pulled from every write-off above — including a damaged *tool* transferred to the Damaged warehouse (see the Field Ops Runbook's damaged-tool stage), not just consumable write-offs. No spreadsheet, no manual tally. --- ## Also worth showing along the way - **Stock Reconciliation.** A quarterly physical count against what the system expects — the backstop for anything nobody reported through Stage 7's write-off flow. - **Stock Ledger Report / Stock Balance.** Filter by warehouse or property to see exactly what's on hand right now, and the running cost of everything issued against it.