sightbox/playbook/CONSUMABLES_DEMO_GUIDE.md

6.8 KiB

Consumables Runbook — Receiving, Issuing, Reordering, Write-Offs

Companion to the Field Ops Runbook — that one covers tools (checkout, signature, return). This one covers the other half of the store: how new stock first enters the system, consumable parts that get used up rather than returned, and a field technician requesting parts for themselves — plus the two things that make routine restocking low-maintenance: automatic reordering and loss visibility.

Login URL (this test environment): http://localhost:8083/login

Demo accounts

Role Email Password
Dispatcher dispatcher@sightbox.local Dispatch2026!
Technician (Stock User) site.supervisor@sightbox.local FieldTech2026!
Store Manager store.manager@sightbox.local StoreMgr2026!

The scenario

A delivery arrives at Main Store with both parts and a tool. Later, ongoing maintenance work keeps drawing down PVC Pipe Fitting stock — including a technician who runs short on-site and requests more for themselves. Separately, a box of Wall Anchor Kit gets damaged on a job and needs writing off.


Stage 1 — Receive new stock into Main Store

Every item — consumable or tool — enters the system here, before anything else can happen.

  1. Search New Stock Entry. Set Purpose: Material Receipt, Target Warehouse: Main Store - JPT.
  2. Add Row: PVC Pipe Fitting 1/2in, Qty 50, Basic Rate: 0.75.
  3. Add Row: Cordless Drill - DeWalt 20V, Qty 1, Basic Rate: 179.00 — assign it a new Serial No (e.g. TOOL-00004). This is what makes this specific unit traceable for the rest of its life in the system.
  4. Capture the Signature of whoever received the delivery, and attach a Photo of the packing slip or the items themselves.
  5. Click Submit.

What happens: stock rises immediately at Main Store — both items are now on hand, and the new drill's own Serial No record exists, ready to be checked out (see the Field Ops Runbook).

⚠ If Basic Rate is skipped, ERPNext blocks submission with a valuation error — since this entry isn't linked to a Purchase Order, a rate has to be entered by hand. Know this before a live demo so it doesn't look like something broke.


Stage 2 — Store Manager logs parts used at a property

The routine case: the store manager issues parts directly, no request needed.

  1. Search New Stock Entry. Set Purpose: Material Issue.
  2. Set Source Warehouse: Main Store - JPT.
  3. Add Row: PVC Pipe Fitting 1/2in, Qty 15.
  4. In Remarks, note the job — e.g. "Riverside Plaza — hallway lighting repair."
  5. Capture the Signature of whoever collected the parts.
  6. Click Submit.

What happens: Main Store's PVC Pipe Fitting drops by 15, the cost is attributed to this specific job on the Stock Ledger, and there's a signed record of who took it — not just a number that quietly went down.


Stage 3 — Technician requests parts for themselves

Not every request comes through the office. A technician on-site who's run short doesn't need the dispatcher to ask on their behalf — they can raise it directly.

Log in as the Technician.

  1. Click the search bar. Type New Material Request and press Enter.
  2. Set Material Request Type to Material Issue.
  3. Add Row: PVC Pipe Fitting 1/2in, Qty 5.
  4. In Remarks, note which job it's for.
  5. Click Save, then Submit.

What happens: the request status automatically becomes Pending Approval — the same workflow as any other request, regardless of who raises it.


Stage 4 — Store Manager approves the request

Log in as the Store Manager.

  1. Search Material Request, press Enter, open the technician's request from Stage 3.
  2. Click the Approve button at the top of the form.

What happens: the request moves to Approved and is now ready for anyone with fulfillment access to act on — not necessarily the store manager themselves.


Stage 5 — Dispatcher fulfills it

Log in as the Dispatcher.

  1. Search Material Request, open the approved request from Stage 4.
  2. Click Create → Stock Entry. The item line carries over automatically.
  3. Confirm Purpose: Material Issue, Source Warehouse: Main Store - JPT.
  4. Capture the Signature of whoever is collecting the parts.
  5. Click Submit.

What happens: the Dispatcher — not the Store Manager — physically executes the approved request. Fulfillment isn't gatekept behind one role; anyone with the same stock access the Dispatcher already has can close out an approved request, useful when the store manager is busy elsewhere or the dispatcher is the one actually coordinating who's picking up what.


Stage 6 — The system raises a reorder on its own

No login needed for this one — it's automatic. PVC Pipe Fitting is configured to reorder itself once Main Store's stock drops under 20 units.

  1. Once real usage crosses that line, search Material Request and open the list.
  2. Look for one raised with no human touching it — the system generated it the moment stock hit the threshold.

What this shows: nobody has to remember to check stock levels. The shortage surfaces itself before the store actually runs out, not after.

To trigger this live during a demo: issue enough PVC Pipe Fitting to cross below 20 (repeat Stage 2's steps with a larger quantity). This consumes real demo stock — a quick Material Receipt (Stage 1's pattern, above) tops it back up afterward.


Stage 7 — Report a damaged consumable

  1. Search New Stock Entry. Set Purpose: Material Issue, Source: Main Store - JPT.
  2. Add Row: Wall Anchor Kit, Qty 1.
  3. Set Issue Reason: Damaged.
  4. In Remarks, note briefly what happened.
  5. Capture the Signature of whoever is reporting it.
  6. Click Submit.

What happens: the stock is removed, the loss is attributed to a specific, selected reason, and it's signed for — not just a mystery drop in the count someone has to investigate later.


Stage 8 — Pull the Damage & Cost Report

  1. Search Damage & Cost Report.
  2. Filter by Warehouse, Item, or Issue Reason as needed.

What this shows: real-time loss and damage totals by property or site, pulled from every write-off above — including a damaged tool transferred to the Damaged warehouse (see the Field Ops Runbook's damaged-tool stage), not just consumable write-offs. No spreadsheet, no manual tally.


Also worth showing along the way

  • Stock Reconciliation. A quarterly physical count against what the system expects — the backstop for anything nobody reported through Stage 7's write-off flow.
  • Stock Ledger Report / Stock Balance. Filter by warehouse or property to see exactly what's on hand right now, and the running cost of everything issued against it.