# Consumables Runbook — Receiving, Issuing, Reordering, Write-Offs
|
|
|
|
Companion to the Field Ops Runbook — that one covers tools (checkout, signature, return). This
|
|
one covers the other half of the store: how new stock first enters the system, consumable parts
|
|
that get used up rather than returned, and a field technician requesting parts for themselves —
|
|
plus the two things that make routine restocking low-maintenance: automatic reordering and loss
|
|
visibility.
|
|
|
|
Login URL (this test environment): **http://localhost:8083/login**
|
|
|
|
## Demo accounts
|
|
|
|
| Role | Email | Password |
|
|
|---|---|---|
|
|
| Dispatcher | dispatcher@sightbox.local | Dispatch2026! |
|
|
| Technician (Stock User) | site.supervisor@sightbox.local | FieldTech2026! |
|
|
| Store Manager | store.manager@sightbox.local | StoreMgr2026! |
|
|
|
|
## The scenario
|
|
|
|
A delivery arrives at Main Store with both parts and a tool. Later, ongoing maintenance work
|
|
keeps drawing down PVC Pipe Fitting stock — including a technician who runs short on-site and
|
|
requests more for themselves. Separately, a box of Wall Anchor Kit gets damaged on a job and
|
|
needs writing off.
|
|
|
|
---
|
|
|
|
## Stage 1 — Receive new stock into Main Store
|
|
|
|
Every item — consumable or tool — enters the system here, before anything else can happen.
|
|
|
|
1. Search **New Stock Entry**. Set **Purpose: Material Receipt**, **Target Warehouse:
|
|
Main Store - JPT**.
|
|
2. Add Row: **PVC Pipe Fitting 1/2in**, Qty **50**, **Basic Rate: 0.75**.
|
|
3. Add Row: **Cordless Drill - DeWalt 20V**, Qty **1**, **Basic Rate: 179.00** — assign it a new
|
|
**Serial No** (e.g. **TOOL-00004**). This is what makes this specific unit traceable for the
|
|
rest of its life in the system.
|
|
4. Capture the **Signature** of whoever received the delivery, and attach a **Photo** of the
|
|
packing slip or the items themselves.
|
|
5. Click **Submit**.
|
|
|
|
**What happens:** stock rises immediately at Main Store — both items are now on hand, and the
|
|
new drill's own Serial No record exists, ready to be checked out (see the Field Ops Runbook).
|
|
|
|
⚠ If Basic Rate is skipped, ERPNext blocks submission with a valuation error — since this entry
|
|
isn't linked to a Purchase Order, a rate has to be entered by hand. Know this before a live demo
|
|
so it doesn't look like something broke.
|
|
|
|
---
|
|
|
|
## Stage 2 — Store Manager logs parts used at a property
|
|
|
|
The routine case: the store manager issues parts directly, no request needed.
|
|
|
|
1. Search **New Stock Entry**. Set **Purpose: Material Issue**.
|
|
2. Set **Source Warehouse: Main Store - JPT**.
|
|
3. Add Row: **PVC Pipe Fitting 1/2in**, Qty **15**.
|
|
4. In Remarks, note the job — e.g. "Riverside Plaza — hallway lighting repair."
|
|
5. Capture the **Signature** of whoever collected the parts.
|
|
6. Click **Submit**.
|
|
|
|
**What happens:** Main Store's PVC Pipe Fitting drops by 15, the cost is attributed to this
|
|
specific job on the Stock Ledger, and there's a signed record of who took it — not just a
|
|
number that quietly went down.
|
|
|
|
---
|
|
|
|
## Stage 3 — Technician requests parts for themselves
|
|
|
|
Not every request comes through the office. A technician on-site who's run short doesn't need
|
|
the dispatcher to ask on their behalf — they can raise it directly.
|
|
|
|
Log in as the **Technician**.
|
|
|
|
1. Click the search bar. Type **New Material Request** and press Enter.
|
|
2. Set **Material Request Type** to **Material Issue**.
|
|
3. Add Row: **PVC Pipe Fitting 1/2in**, Qty **5**.
|
|
4. In Remarks, note which job it's for.
|
|
5. Click **Save**, then **Submit**.
|
|
|
|
**What happens:** the request status automatically becomes **Pending Approval** — the same
|
|
workflow as any other request, regardless of who raises it.
|
|
|
|
---
|
|
|
|
## Stage 4 — Store Manager approves the request
|
|
|
|
Log in as the **Store Manager**.
|
|
|
|
1. Search **Material Request**, press Enter, open the technician's request from Stage 3.
|
|
2. Click the **Approve** button at the top of the form.
|
|
|
|
**What happens:** the request moves to **Approved** and is now ready for anyone with fulfillment
|
|
access to act on — not necessarily the store manager themselves.
|
|
|
|
---
|
|
|
|
## Stage 5 — Dispatcher fulfills it
|
|
|
|
Log in as the **Dispatcher**.
|
|
|
|
1. Search **Material Request**, open the approved request from Stage 4.
|
|
2. Click **Create** → **Stock Entry**. The item line carries over automatically.
|
|
3. Confirm **Purpose: Material Issue**, **Source Warehouse: Main Store - JPT**.
|
|
4. Capture the **Signature** of whoever is collecting the parts.
|
|
5. Click **Submit**.
|
|
|
|
**What happens:** the Dispatcher — not the Store Manager — physically executes the approved
|
|
request. Fulfillment isn't gatekept behind one role; anyone with the same stock access the
|
|
Dispatcher already has can close out an approved request, useful when the store manager is busy
|
|
elsewhere or the dispatcher is the one actually coordinating who's picking up what.
|
|
|
|
---
|
|
|
|
## Stage 6 — The system raises a reorder on its own
|
|
|
|
No login needed for this one — it's automatic. PVC Pipe Fitting is configured to reorder itself
|
|
once Main Store's stock drops under 20 units.
|
|
|
|
1. Once real usage crosses that line, search **Material Request** and open the list.
|
|
2. Look for one raised with no human touching it — the system generated it the moment stock hit
|
|
the threshold.
|
|
|
|
**What this shows:** nobody has to remember to check stock levels. The shortage surfaces itself
|
|
before the store actually runs out, not after.
|
|
|
|
*To trigger this live during a demo:* issue enough PVC Pipe Fitting to cross below 20 (repeat
|
|
Stage 2's steps with a larger quantity). This consumes real demo stock — a quick Material
|
|
Receipt (Stage 1's pattern, above) tops it back up afterward.
|
|
|
|
---
|
|
|
|
## Stage 7 — Report a damaged consumable
|
|
|
|
1. Search **New Stock Entry**. Set **Purpose: Material Issue**, **Source: Main Store - JPT**.
|
|
2. Add Row: **Wall Anchor Kit**, Qty **1**.
|
|
3. Set **Issue Reason: Damaged**.
|
|
4. In Remarks, note briefly what happened.
|
|
5. Capture the **Signature** of whoever is reporting it.
|
|
6. Click **Submit**.
|
|
|
|
**What happens:** the stock is removed, the loss is attributed to a specific, selected reason,
|
|
and it's signed for — not just a mystery drop in the count someone has to investigate later.
|
|
|
|
---
|
|
|
|
## Stage 8 — Pull the Damage & Cost Report
|
|
|
|
1. Search **Damage & Cost Report**.
|
|
2. Filter by Warehouse, Item, or Issue Reason as needed.
|
|
|
|
**What this shows:** real-time loss and damage totals by property or site, pulled from every
|
|
write-off above — including a damaged *tool* transferred to the Damaged warehouse (see the
|
|
Field Ops Runbook's damaged-tool stage), not just consumable write-offs. No spreadsheet, no
|
|
manual tally.
|
|
|
|
---
|
|
|
|
## Also worth showing along the way
|
|
|
|
- **Stock Reconciliation.** A quarterly physical count against what the system expects — the
|
|
backstop for anything nobody reported through Stage 7's write-off flow.
|
|
- **Stock Ledger Report / Stock Balance.** Filter by warehouse or property to see exactly what's
|
|
on hand right now, and the running cost of everything issued against it.
|